Bridge 2

← Back to Projects

Bridge 2 is located after the Causeway and crosses the north branch of the Cross River heading towards John Jay Middle School.

 Stats & Status

  • COMPLETED April 2018
  • 27′ span, 20′ ramp plus 46′ boardwalk extension – total length ~93 feet.
  • Bridge span completed April 2018 and temporary plywood placed over boardwalk joists for inaugural race April 15, 2018.
  • Boardwalk section final work completed May 2019
  • Total work time 4 months
Bridge 2 looking from the boardwalk side.