Bridge 1

JJTrail Map detail showing locations and status of the bridge, causeway, and boardwalk structures.

← Back to Projects

Bridge 1 crosses the north branch of the Cross River on the trail coming downhill about 1/4 mile along the trail from the Pit Field.

It was the first construction project completed on the John Jay Community Trail and showed that the design worked very well for Gator access and that the bridge had strength and durability to last many years.

Stats & Status

  • COMPLETED October 2017
  • 26′ span, 2x 16′ ramps
  • First structure built on JJTrail.
  • 75% of materials brought to site (1/4 mile in) by hand before we secured regular and much appreciated access to the KLSD athletic department’s Gator utility vehicle.
  • Total work time estimate: 2 1/2 months

Bridge #1 during construction and after completion.